Feeds:
Posts
Comments

Posts Tagged ‘excavation’

Inline inspections identified anomalies at multiple points in Segment 324 of Sable’s onshore pipeline. Sable is conducting validation digs.(Noozhawk image).

Sable Offshore has asked Santa Barbara County for approval to conduct exploratory digs to check anomalies at seven points along onshore Segment 324 of the Santa Ynez Unit pipeline system. This 10.86 mile segment runs from the Los Flores Canyon Processing Facility to the Gaviota Pump Station (map below).

According to the Emergency Special Permit issued by PHMSA, Sable is required to conduct in-line inspections (ILIs) with metal loss tools every 6 months for the first 2 years of operation.

Where metal loss is identified, immediate repair is required if the remaining strength of pipe shows a predicted failure pressure <1.39 times the maximum operating pressure (MOP).

Where direct field examinations indicate pipe wall loss of 40% or more, permanent repairs are required.

Comments:

Read Full Post »