
More than half of GoM oil production was shut-in for 13 days in September and several hundred thousand BOPD were shut-in for the rest of the month. The result was a 42% reduction in production from pre-Ida (July) levels.
All production has now been restored so the December EIA figures should give us a good read on stablized post-Ida production.
Leave a Reply