“Under the direction of the federal science team and U.S. government engineers, BP used the Development Driller II to successfully install a fully functioning and tested Blow Out Preventer (BOP) on the cemented Macondo 252 well. Earlier today, BP lifted the damaged BOP, which will now be lifted to the surface and recovered. During the period of time between the removal of the damaged BOP and installation of the replacement BOP, there was no observable release of hydrocarbons from the well head. This procedure was undertaken in accordance with specific conditions I set forth last week in a directive authorizing this procedure. This is an important milestone as we move toward completing the relief well and permanently killing the Macondo 252 well. I will continue to provide updates as necessary.” Admiral Allen
You have to love the wording of these Unified Command announcements. I trust (hope) that the language in bold is added by the public relations staff, and that the Admiral and the science team are secure enough in their leadership roles that they don’t need to continuously remind people about their importance.
Have the Admiral and the science team also directed the operations that have not gone so well, or only the successes? In particular, we would be interested in learning about the decision making process that led to the early cessation of the dynamic top-kill, the Unified Command’s insistence that pressure be vented after the well had been capped (fortunately, this decision was reversed), and the rationale for finishing the relief well intercept.
Leave a comment