Capping Stack BOP Before Installation on Well
Here we go ……
- Close rams to shut-in flow from the top while allowing flow through choke and kill lines on sides of capping stack.
- Slowly close kill line.
- Slowly close choke line.
- If the pressure holds through all 3 steps, Secretary Chu does a touchdown dance in the BP control room (BOE exclusive :))
Other:
- Operation will be halted every 6 hours to monitor pressure;
- Ongoing ROV monitoring of well and seafloor;
- Remote sensing systems looking for evidence of leakage outside the wellbore;
- Up to a 48 hour process