Feeds:
Posts
Comments

Posts Tagged ‘Gaza pier’

This is very true, but engineers may not have a choice when directed to optimize a flawed decision.

Gaza pier

For example, the installation of the Gaza pier was a political decision imposed on military engineers without assessing the operational risks. The $230 million pier was in operation for only 20 days, long enough for several serious injuries to result from the reckless decision.

Some of the worst offshore drilling incidents were largely the result of culture or management driven attempts to save time and money. Modest cost savings were prioritized over verifying well integrity during both the Montara and Macondo well suspensions. The Santa Barbara blowout was the result of eliminating a casing string during development drilling, which virtually assured an uncontrolled flow in the event of a well kick.

Danenberger slide

 

Read Full Post »