

Per JL Daeschler, Sedco’s Far East, North Sea, and South America operations were all run from Dallas in the late 60’s. In 1970, an old schoolhouse became Sedco’s corporate headquarters (see picture and narrative pasted above). Thank you Bill Clements for saving this historic building – what a beautiful headquarters for the challenging and booming offshore industry!
JL: After 2 years with SEDCO in Miri, East Malaysia (1971) I moved to Brownsville Tx. But in 1979 I returned to the old school house in Dallas in secondment to Sedco Hamilton Production Services from Hamilton Brothers Oil & Gas. The main objective of the joint venture was promotion of floating production systems and in particular use of semi sub technology. One project assignment was the BP “Buchan” field in the North Sea. (Note: this work was a precursor to the deepwater floating production units that are now the method of choice for deepwater development in the Gulf.)
JL is pictured (right below) on the Sedco 135 during operations offshore East Malaysia.

Wisdom from JL: Rules were pretty simple, as you can read on the rig wall in the picture. No App, pin, or password…. In fact no internet and mobile phone, just a radio operator.
Safety was grounded in the attitude and respect of 100 + people living and working together (47 working / 47 sleeping and 6 managing and protecting others. More difficult was the integration of the visiting contractors, logging/cementing / diving / VIPs. (Still true today!)
No division amongst ages, nationality ( sometimes 6 of them) religions, Job position , and ethnicity. Just get along and do what you get paid for!
Safety issues were dealt with immediately with short, unscheduled “toolbox” meetings – less reporting and more fixing.
(As an aside, Dan Bourgeois and I were on assignment to Petronas in 1977 and visited their East Malaysian operations. Does anyone in Petronas remember us? 😉)
Leave a comment