For the first 12 hours on June 8th (midnight to noon), approximately 7,850 barrels of oil were collected and 15.2 million cubic feet of natural gas was flared.
The production engineers are doing a good job managing this operation.
June 8, 2010 by offshoreenergy
For the first 12 hours on June 8th (midnight to noon), approximately 7,850 barrels of oil were collected and 15.2 million cubic feet of natural gas was flared.
The production engineers are doing a good job managing this operation.
Leave a comment